The most advanced gas turbine, M701JAC by Mitsubishi, has arrived at our construction site. The M701JAC turbine with weight of 550 ton, stands out for:
- A power output of 550 MW, that ensures a stable operation even for the largest facilities;
- An efficiency of over 64% in combined cycle, which is the best in its class.
The hydrogen-cooled generator, specially designed for this turbine, will ensure its longevity and stable performance. The entire equipment installation process will take about 6 months, and we are already started the works.
Get prepared for upcoming progress!